上。然后固定泵軸及機封、泵蓋、葉輪等軸系部件。最后裝進泵體 2.2 Assembly of directly connected structure pump
After the electrical axle shaft coupling on the
correct position, set tight the screws, and set the engine on the shelf
tightly. Then fix components such as the pump bearing, engine cover, pump
cover, impeller and shafts. Finally load the pump body, secure bolts and screw
on the demolition screws.
2.3帶中間聯(lián)軸器結(jié)構(gòu)泵的裝配
a.轉(zhuǎn)動體部件的裝配。擋油盤 b.泵體裝上密封環(huán)后,將轉(zhuǎn)動體部件裝上泵體部件 c.將電機聯(lián)軸器裝上電機 d.裝上彈性套柱銷螺塞 2.3 Assembly of the pumps with intermediate shaft
coupling
a. Assembly of intermediate shaft couplings. After
the block oil basin, bearings, are in the shaft, lock the round nut and put
into the shaft body, then load bearings gland and pumps cover, adjust bearings
windage (O.05-0.10mm), load machinery seal, impeller, etc, and park impeller
nut, and then load the shaft coupling in the other side and lock the round nut.
b. After the pump body is fixed seal ring, install
the turning body parts to the pump body components
c. c.Electrical shaft coupling will be loaded, fixed
after the position is adjusted well and then loaded onto the middle device,
then the entire electrical components installed in racks.
d. d.Loaded other components such as flexible sets of
pillars sales shaft and gauge
2.4 拆卸和裝配程序相反 2.4 Dismantling procedures are contrary with the
assembly ones.
|