定,將軸承體壓蓋用固定螺釘緊固。
4、裝上填料、放好中開面紙墊、蓋上泵蓋、擰緊螺尾錐銷后 裝配完成后 拆卸可按上述裝配順序相反地進行。
1、檢查水泵和電機應無損壞:
2、水泵的安裝首先要滿足裝置汽蝕余量NPSHa大于泵的必須汽蝕余量NPSHr,使泵在運行時不發(fā)生汽蝕。基礎尺寸應符合泵機組的安裝尺寸 3 (1) (2) (3) (4)、校正電動機軸與水泵軸的同心度 (5)、在檢查電動機轉向與水泵轉向符
circle
of the impeller seal position and the sleeve excircle on the rotor part Norminal
Diameter
<50
>50~
120
>120~
260
>260~
500
>500~
800
>800~
1250
Beats
0.05
0.06
0.08
0.10
0.12
0.16
|
3. Assemble the rotor part
and studs on the pump casing and well install the bearing gland and tighten it with
bolls, then you can adjust the
axial position of the impeller with shaft sleeve nuts up to middle flow passage
way of the pump casing and tighten it.
4. Feed the packing into the
packing box. Place the horicental joint paper gasket, cover the pump, hammar(or other
things) the taper pin with exteral thread
tightly, the following, screw its unts aud mount the packiug gland which degree
of the packing tightness must be suitable (if too light, the shaft
sleeve would be over heated, samely
more power would be consumed; if too loose, the leakage of liquid would be found
from here, and thus would decrease
the pump efficiency. )
After finishing assembling the pump, turn the rotor with hands, it should be
flexible and smooth as well as no block and no rubbing. That is OK! and then you
can operate it freely.
(Disassemble it according to
the opposite order of assembling)
1. Check whether the pump
and the motor are in good condition.
2. Make sure that the value
of NPSH is higher than the one that have been given, and its fouudation dimensions
should be in comformity with the installation drawing.
3. The steps of
installation:
(1) Sleeve the foot bolts
and hat the nuts on the pump and the motor, place the pump on the concret foundation
where some foot bolt holes are pre -built, correct the horizontal and the
coaxial degree between
|